The routine may be called by the names g07ebf or nagf_univar_robust_2var_ci.
3Description
Consider two random samples from two populations which have the same continuous distribution except for a shift in the location. Let the random sample, , have distribution and the random sample, , have distribution .
g07ebf finds a point estimate, , of the difference in location together with an associated confidence interval. The estimates are based on the ordered differences . The estimate is defined by
Let , for , denote the (ascendingly) ordered differences , for and . Then
if is odd, where ;
if is even, where .
This estimator arises from inverting the two sample Mann–Whitney rank test statistic, , for testing the hypothesis that . Thus is the value of the Mann–Whitney statistic for the two independent samples and . Effectively is a monotonically increasing step function of with
The estimate is the solution to the equation ; two methods are available for solving this equation. These methods avoid the computation of all the ordered differences ; this is because for large and both the storage requirements and the computation time would be high.
The first is an exact method based on a set partitioning procedure on the set of all differences , for and . This is adapted from the algorithm proposed by Monahan (1984) for the computation of the Hodges–Lehmann estimator for a single population.
The second is an iterative algorithm, based on the Illinois method which is a modification of the regula falsi method, see McKean and Ryan (1977). This algorithm has proved suitable for the function which is asymptotically linear as a function of .
The confidence interval limits are also based on the inversion of the Mann–Whitney test statistic.
Given a desired percentage for the confidence interval, , expressed as a proportion between and initial estimates of the upper and lower confidence limits for the Mann–Whitney statistic are found;
where is the inverse cumulative Normal distribution function.
and are rounded to the nearest integer values. These estimates are refined using an exact method, without taking ties into account, if and and a Normal approximation otherwise, to find and satisfying
and
The function is a monotonically increasing step function. It is the number of times a score in the second sample, , precedes a score in the first sample, , where we only count a half if a score in the second sample actually equals a score in the first.
Let ; then . This is the largest value such that .
Let ; then . This is the smallest value such that .
As in the case of , these equations may be solved using either the exact or iterative methods to find the values and .
Then is the confidence interval for . The confidence interval is thus defined by those values of such that the null hypothesis, , is not rejected by the Mann–Whitney two sample rank test at the level.
4References
Lehmann E L (1975) Nonparametrics: Statistical Methods Based on Ranks Holden–Day
McKean J W and Ryan T A (1977) Algorithm 516: An algorithm for obtaining confidence intervals and point estimates based on ranks in the two-sample location problem ACM Trans. Math. Software10 183–185
Monahan J F (1984) Algorithm 616: Fast computation of the Hodges–Lehman location estimator ACM Trans. Math. Software10 265–270
5Arguments
1: – Character(1)Input
On entry: specifies the method to be used.
The exact algorithm is used.
The iterative algorithm is used.
Constraint:
or .
2: – IntegerInput
On entry: , the size of the first sample.
Constraint:
.
3: – Real (Kind=nag_wp) arrayInput
On entry: the observations of the first sample,
, for .
4: – IntegerInput
On entry: , the size of the second sample.
Constraint:
.
5: – Real (Kind=nag_wp) arrayInput
On entry: the observations of the second sample,
, for .
6: – Real (Kind=nag_wp)Input
On entry: the confidence interval required, ; e.g., for a confidence interval set .
Constraint:
.
7: – Real (Kind=nag_wp)Output
On exit: the estimate of the difference in the location of the two populations, .
8: – Real (Kind=nag_wp)Output
On exit: the estimate of the lower limit of the confidence interval, .
9: – Real (Kind=nag_wp)Output
On exit: the estimate of the upper limit of the confidence interval, .
10: – Real (Kind=nag_wp)Output
On exit: an estimate of the actual percentage confidence of the interval found, as a proportion between .
11: – Real (Kind=nag_wp)Output
On exit: the value of the Mann–Whitney statistic corresponding to the lower confidence limit, .
12: – Real (Kind=nag_wp)Output
On exit: the value of the Mann–Whitney statistic corresponding to the upper confidence limit, .
13: – Real (Kind=nag_wp) arrayWorkspace
14: – Integer arrayWorkspace
15: – IntegerInput/Output
On entry: ifail must be set to , or to set behaviour on detection of an error; these values have no effect when no error is detected.
A value of causes the printing of an error message and program execution will be halted; otherwise program execution continues. A value of means that an error message is printed while a value of means that it is not.
If halting is not appropriate, the value or is recommended. If message printing is undesirable, then the value is recommended. Otherwise, the value is recommended. When the value or is used it is essential to test the value of ifail on exit.
On exit: unless the routine detects an error or a warning has been flagged (see Section 6).
6Error Indicators and Warnings
If on entry or , explanatory error messages are output on the current error message unit (as defined by x04aaf).
Errors or warnings detected by the routine:
On entry, .
Constraint: .
On entry, .
Constraint: .
On entry, .
Constraint: or .
On entry, .
Constraint: .
Not enough information to compute an interval estimate since each sample has identical values. The common difference is returned in theta, thetal and thetau.
The iterative procedure used to estimate, , the lower confidence limit has not converged. This is an unlikely exit but the estimate should still be a reasonable approximation.
The iterative procedure used to estimate, , the upper confidence limit has not converged. This is an unlikely exit but the estimate should still be a reasonable approximation.
The iterative procedure used to estimate has not converged. This is an unlikely exit but the estimate should still be a reasonable approximation.
An unexpected error has been triggered by this routine. Please
contact NAG.
See Section 7 in the Introduction to the NAG Library FL Interface for further information.
Your licence key may have expired or may not have been installed correctly.
See Section 8 in the Introduction to the NAG Library FL Interface for further information.
Dynamic memory allocation failed.
See Section 9 in the Introduction to the NAG Library FL Interface for further information.
7Accuracy
g07ebf should return results accurate to five significant figures in the width of the confidence interval, that is the error for any one of the three estimates should be less than .
8Parallelism and Performance
g07ebf is threaded by NAG for parallel execution in multithreaded implementations of the NAG Library.
g07ebf makes calls to BLAS and/or LAPACK routines, which may be threaded within the vendor library used by this implementation. Consult the documentation for the vendor library for further information.
Please consult the X06 Chapter Introduction for information on how to control and interrogate the OpenMP environment used within this routine. Please also consult the Users' Note for your implementation for any additional implementation-specific information.
9Further Comments
The time taken increases with the sample sizes and .
10Example
The following program calculates a 95% confidence interval for the difference in location between the two populations from which the two samples of sizes and are drawn respectively.