D02PFF Example Program Results
Calculation with TOL = 0.1E-03
t y1 y2
0.000 0.0000 1.0000
0.785 0.7071 0.7071
1.519 0.9987 0.0513
2.282 0.7573 -0.6531
2.911 0.2285 -0.9735
3.706 -0.5348 -0.8450
4.364 -0.9399 -0.3414
5.320 -0.8209 0.5710
5.802 -0.4631 0.8863
6.283 0.0000 1.0000
Cost of the integration in evaluations of F is 204
Calculation with TOL = 0.1E-04
t y1 y2
0.000 0.0000 1.0000
0.393 0.3827 0.9239
0.785 0.7071 0.7071
1.416 0.9881 0.1538
1.870 0.9557 -0.2943
2.204 0.8062 -0.5916
2.761 0.3711 -0.9286
3.230 -0.0880 -0.9961
3.587 -0.4304 -0.9026
4.022 -0.7710 -0.6368
4.641 -0.9974 -0.0717
5.152 -0.9049 0.4256
5.521 -0.6903 0.7235
5.902 -0.3718 0.9283
6.283 0.0000 1.0000
Cost of the integration in evaluations of F is 314